Width of lanes in tunnel

3'50 m.

 

Width of branch lanes

3'50-4'25 m.

M of excavated tunnel

2.850

 

M of false tunnel

135

M of false acoustic tunnel

112

 

Minimum elevation of project

15 m.

Maximum elevation of project

73 m.

 

M2 of expropriated land

220.000

M2 of temporary occupation

125.000

 

M3 of open excavation in earth

637.293

M3 of open excavation in rock

671.994

 

M3 of excavation in tunnels

328.400

M3 of road fill

446.206

 

M3 of dump

1.191.000

Linear meters (LM) of one-lane branches

4.250

 

LM of two-lane branches

820

M2. of structures (10 units)

5.395

 

M2 of walls (18 units)

6.440

LM of lighting strip

30

 

M2 of asphalt pavement

82.300

M2 of repositioned pavement

27.600

 

M2 of landscaping

230.000

M2 of acoustic screen

630

 

M2 of double glazing

1.320

SOS post units

68

 

Changeable message panels

14

Lanes with manual toll units

7

 

Lanes with automatic units

4

Lanes with dynamic units

4

Lanes with electronic toll units

All (15)