Width
of lanes in tunnel
|
3'50
m.
|
| |
Width
of branch lanes
|
3'50-4'25
m.
|
 |
M
of excavated tunnel
|
2.850
|
| |
M
of false tunnel
|
135
|
 |
M
of false acoustic tunnel
|
112
|
| |
Minimum
elevation of project
|
15
m.
|
 |
Maximum
elevation of project
|
73
m.
|
| |
M2
of expropriated land
|
220.000
|
 |
M2
of temporary occupation
|
125.000
|
| |
M3
of open excavation in earth
|
637.293
|
 |
M3
of open excavation in rock
|
671.994
|
| |
M3
of excavation in tunnels
|
328.400
|
 |
M3
of road fill
|
446.206
|
| |
M3
of dump
|
1.191.000
|
 |
Linear
meters (LM) of one-lane branches
|
4.250
|
| |
LM
of two-lane branches
|
820
|
 |
M2.
of structures (10 units)
|
5.395
|
| |
M2
of walls (18 units)
|
6.440
|
 |
LM
of lighting strip
|
30
|
| |
M2
of asphalt pavement
|
82.300
|
 |
M2
of repositioned pavement
|
27.600
|
| |
M2
of landscaping
|
230.000
|
 |
M2
of acoustic screen
|
630
|
| |
M2
of double glazing
|
1.320
|
 |
SOS
post units
|
68
|
| |
Changeable
message panels
|
14
|
 |
Lanes
with manual toll units
|
7
|
| |
Lanes
with automatic units
|
4
|
 |
Lanes
with dynamic units
|
4
|
 |
Lanes
with electronic toll units
|
All
(15)
|